PV + BESS PPA · Commercial & industrial · Hungary

Solar + storage behind your meter. €0 CAPEX. Savings from year one.

EASENERGY finances, builds, owns and operates a solar plant and battery on your site. You buy the output at a fixed EUR price under a 10–20 year contract — no investment, no O&M, no permitting headache.

Turnkey delivery Fixed EUR pricing Purchase option from year 5

Turnkey & tailor-made

You choose. We build. We operate.

We finance and run everything — your team makes exactly one decision, and stays focused on its own business. The whole system runs behind your meter, with no electricity injected into the grid.

STEP 1

You choose

Your installation type
Any mix to suit your site
STEP 2

We build

€0 client CAPEX
  • Engineering
  • Procurement
  • Permitting
  • Deployment
3–12 mo development · 2–6 mo build
STEP 3

We operate

€0 client O&M cost
  • Management
  • Maintenance
  • Monitoring & insurance
10, 15 or 20-year contract · EUR · indexation optional
Client savings start in year oneAll-inclusive: €0 CAPEX · €0 O&M · €0 advance payment · €0 Robin-Hood tax · €0 system usage fee (RHD)

Who it's for

Built for energy-intensive operations

If your site runs meaningful daytime load — production lines, cooling, compressed air — on-site solar and storage is usually the cheapest electricity available to you.

Automotive suppliers Food & beverage Cold storage & logistics Pharma & chemicals Plastics & packaging Machinery & metals

Accelerate the transition

Clean, on-site energy in roughly twelve months — without building the capability in-house.

Lower carbon footprint

Cut Scope 2 emissions with renewable power generated where you consume it.

Lower energy costs

Pay less than the grid, at a fixed EUR price you can plan around for a decade or more.


The economics

Where your savings come from

Two independent mechanisms, one contract. Solar displaces daytime grid purchases; the battery arbitrages the daily price spread — charging at the cheapest hours and discharging at the most expensive.

On-site solar production

Power from your own roof or land replaces electricity you would otherwise buy from the grid during the day.

~ 20–45 €/MWh below wholesale prices
€1,500–20,000SAVED / YEAR / PV MWp

Battery storage & hybrids

The BESS charges during the lowest-price hours and discharges during the highest — typically expensive night blocks.

~ 30–40 €/MWh on wholesale spreads
€3,000–15,000SAVED / YEAR / BESS MWh

Indicative ranges based on Hungarian wholesale (HUPX) price levels and grid-related costs. Your actual savings depend on your consumption profile, site and contract length — we model them precisely in your non-binding offer.

How it flows, day and night

Grid (day): 110–185 €/MWh
CLIENT BEHIND THE METER UTILITY GRID TRADER METER YOUR SITE BESS PV PLANT EASENERGY finances, owns & operates the PV + BESS assets
Solar Battery Grid
Day — solar supplies your load and charges the battery at the cheapest hours

CAPEX vs. the EASENERGY model

Your team shouldn't have to become a solar developer

Buy it yourself

  • Large upfront capital ties up your cash
  • Building a solar plant isn't your core business
  • You carry O&M, monitoring & performance risk
  • Hidden costs: overhead, insurance, downtime
  • Technology & obsolescence risk sits on your books
  • Internal time & expertise pulled from operations
OUR OFFER

The EASENERGY model

  • €0 CAPEX — we finance 100%
  • Stay focused on what you do best
  • We design, build, own & operate it
  • All-inclusive O&M, monitoring & insurance
  • We carry the technology & performance risk
  • Savings from year one at a fixed € price
Same clean power — without the capital, the risk, or the distraction.

A transparent, end-to-end process

From first call to commissioning in ~12 months

PHASE 1

Commercial

Non-binding offer, binding offer, term sheet and contract negotiation.

Months 1–6
PHASE 2

Pre-development

Environmental assessment and technical design documents for the building permit.

Months 5–8
PHASE 3

Permitting

Building permit, fire-safety plan (TMMT) with BM OKF review, MEKH plant establishment notification.

Months 7–10
PHASE 4

Construction & licensing

Build, commissioning and use permit.

Months 10–12
PHASE 5

Operation

COD and MEKH plant operation registration — savings begin.

Month 12 →

Indicative timeline for a typical Hungarian C&I site; the exact schedule depends on site conditions and permitting authorities. We handle every step on your behalf.


Before you ask

Fair questions, straight answers

Do we pay anything upfront — or anything hidden later?

No. EASENERGY finances 100% of the investment. You pay one fixed EUR fee for the energy — O&M, monitoring, insurance and asset-related taxes are all included. No advance payment, no Robin-Hood tax, no system usage fee (RHD) on top.

Do we have to change our electricity supplier?

No. The system runs behind your meter, alongside your existing grid supply. Your current supplier keeps covering whatever the plant and battery don't.

Who owns the system — and what happens at the end?

EASENERGY owns and operates the assets for the full term, so the technology and performance risk stays on our books, not yours. You hold a purchase option after year 5, and again at the end of the contract.

What if we consume less than the system produces?

The contract is take-or-pay: you commit to the estimated production under real weather conditions. Because nothing is exported to the grid, it's in both parties' interest to size the plant below your real consumption — we design it from your actual load data, not optimistic assumptions.

What do you need from us to prepare an offer?

Three things: your site address, roughly 12 months of consumption data (load profiles if you have them), and what surface is available — roof, carport or ground. From there, we come back with a non-binding offer.

Your dedicated contacts

Ready to accelerate your energy transition?

Tell us about your site and consumption — we'll come back with a non-binding offer. No cost, no commitment.

Request a non-binding offer

Helpful to include: site address · available roof / carport / ground area — and attach your last 12 months of consumption data (.xlsx / .csv)

BM
Bence Molnár
Managing Director
bmolnar@easenergy.eu
+36 20 435 3950
DN
David Novák
Managing Director
dnovak@easenergy.eu
+36 70 948 1590